Correct Answer:
C. Direct material + Direct labour + Direct expenses
Correct answer: Direct material + Direct labour + Direct expenses Prime cost is the total of all direct costs: direct material + direct labour + direct expenses.
- Prime cost + Factory overheads: That is the factory (works) cost.
- Factory cost + Office overheads: That is the total cost of production.
- Total cost + Profit: Profit is added after total cost, not in prime cost.
Key point: Prime cost = all direct costs.
Source: QuizWing Model Paper 1, Q25.