Kaizen costing focuses on:
Kaizen means continuous improvement.
Explore Cost and Management Accounting MCQs with answers and explanations. Topics include costing methods, cost classification, material and labour costing, overheads, budgeting, budgetary control, standard costing, variance analysis and management decision-making. Suitable for FPSC, PPSC and other competitive examinations.
Kaizen means continuous improvement.
JIT uses a pull system to minimize inventory holding and waste.
EOQ = square root of (2 x 10,000 x 50 / 4) = square root of 250,000 = 500.
Under target costing, price is set by the market and cost is managed to achieve the required profit.
Cash budgets help plan borrowing and surplus investment.
A profit center is responsible for revenues and costs; an investment center is also responsible for invested capital.
ROI = 150,000 / 1,000,000 = 15%.
RI = 200,000 - (12% x 1,000,000) = 200,000 - 120,000 = Rs. 80,000.
Transfer pricing affects divisional performance measurement.
The Balanced Scorecard by Kaplan and Norton uses these four perspectives.
LRV = (AR - SR) x AH = (22 - 20) x 100 = Rs. 200 adverse.
LEV = (SH - AH) x SR = (100 - 90) x 20 = Rs. 200 favorable.
A favorable variance increases profit relative to standard; it does not automatically mean good performance.
The master budget combines operating and financial budgets.
Flexible budgets allow fair comparison of actual costs with costs allowed at the actual activity level.
ZBB requires each activity to be justified afresh rather than relying on the previous year.
Also called the limiting factor; it is usually sales demand, but may be materials, labor or capacity.
MPV = (AP - SP) x AQ = (12 - 10) x 500 = Rs. 1,000 adverse.
MUV = (SQ - AQ) x SP = (500 - 480) x 10 = Rs. 200 favorable.
Under-absorption means too little overhead was charged to production compared with the actual amount.
ABC traces costs to activities and then to products using cost drivers.
Examples include number of set-ups, machine hours and number of orders.
Standard costs act as benchmarks for control through variance analysis.
Weighted average pools opening WIP cost and current cost to compute the average cost per equivalent unit.
Normal loss is inherent in the process and its cost is included in the cost of good output.