PREMIUM
📚 FPSC SST 2026 Preparation Group
Join Our WhatsApp Group for SST Past Papers & Mock Tests
✅ Daily MCQs • 💡 Expert Tips • 📚 Past Paper Discussion
Join Group →

The Dul Hasti Stage II Hydroelectric Project in India is located on which river?

A. Jhelum River
B. Ravi River
C. Chenab River
D. Indus River
Correct Answer: C. Chenab River

The correct answer is Chenab River. The Dul Hasti Hydroelectric Project is a run‑of‑the‑river power project located in the Kishtwar district of Jammu and Kashmir, India. It is built on the Chenab River (Stage I commissioned earlier, and Stage II planned on the same river). Among the options:

  • Jhelum River: Incorrect; Jhelum is associated with other projects.
  • Ravi River: Incorrect.
  • Chenab River: Correct; the project is located on this river.
  • Indus River: Incorrect.

Therefore, the correct river is "Chenab River".

Leave a Comment

Your email address will not be published. Required fields are marked *

Join Our WhatsApp Channel ×
Scroll to Top