PPSC Assistant (BS-16) Various Departments Past Papers 2024

PPSC Assistant (BS-16) Various Departments Past Papers 2024 P · PPSC past papers,PPSC assistant past papers,PSC MCQs,PPSC exam preparation, …

Which is the highest peak of Pakistan

A. k2
B. Nanga Parbat
C. Rakaposhi
D. Gasherbrum I
Correct answer is: A. k2
Pakistan's peaks include the famed K2 (8,611 m), the 2nd-highest peak in the world, and the 9th highest, Nanga Parbat (8,125 m), making Pakistan a dream trip for the most adventurous mountaineers

Which of the following is not a valid data type in Excel

A. Number
B. Character
C. Label
D. Date
Correct answer is: B. Character
Excel does not have a separate “Character” type; uses Number, Text, Date, etc.

نرمی تاریکی سردی کیا ہے؟

A. اسم کیفیت
B. اسم عالیه
C. اسم صفت
D. اسم مفعول
Correct answer is: A. اسم کیفیت

Which US president visited Pakistan in 1969

A. Dwight D. Eisenhower
B. Lyndon B. Johnson
C. Richard M. Nixon
D. William J. Clinton
Correct answer is: C. Richard M. Nixon
Nixon visited Pakistan during his South Asia tour in December 1969.

Which canal connects the Pacific and Atlantic oceans

A. Panama Canal
B. Red Sea
C. North Sea
D. Suez Canal
Correct answer is: A. Panama Canal
Central American canal connecting Pacific and Atlantic Oceans.

The sum of ages of two children is 12 and their product is 32. The age of elder child is

A. 8 years
B. 10 years
C. 12 years
D. 7 years
Correct answer is: A. 8 years
nill

انگریزوں نے فورٹ ولیم کالج میں پہلی بار چھاپہ خانے لگایا، کونسا رسم الخط استعمال ہوا؟

A. نستعلیق
B. بند کو
C. (Incomplete)
D. ان میں سے کوئی نہیں
Correct answer is: A. نستعلیق
First printing press in Fort William College used Nastaliq script.

Pakistan receives rainfall in the months of July to September in the

A. Monsoon
B. Summer
C. Winter
D. Autumn
Correct answer is: A. Monsoon
The monsoon season brings most of Pakistan’s annual rainfall between July and September.

Rakaposhi is located in

A. Karakoram
B. Himalayan
C. Hindu Kush
D. None of these
Correct answer is: A. Karakoram
Mountain in Gilgit-Baltistan, Pakistan, 7,788 m.

Four men working together can do a ditch in 42 days. They begin, one man half days. How long will it take to complete

A. 45 days
B. 48 days
C. 52 days
D. 60 days
Correct answer is: B. 48 days
Work and time problem using proportion of man-days.
Join Our WhatsApp Channel! ×
Scroll to Top